Volkswagen | Encamp

Volkswagen Group of America operates one of the most complex environmental compliance footprints in the automotive industry. The Chattanooga assembly plant runs a full paint shop, body shop, and assembly line — generating significant regulated hazardous waste every month. Distribution centers, testing facilities, and support operations add Tier II obligations across multiple states. Every site has a deadline. Every deadline has consequences.

Encamp gives your EHS team one system and one expert support team to manage RCRA and Tier II across your entire U.S. footprint — so nothing gets missed and nobody is scrambling in February.

Resources

The RCRA Guide

From waste stream classification and generator status determination to manifest reconciliation and what’s changing in 2026 — this guide gives EHS professionals at large manufacturing operations the practical framework to manage RCRA with confidence. Covers LQG requirements, 90-day accumulation rules, e-Manifest registration, and the state-specific variations that trip up even experienced teams.

The RCRA Checklist

Across 60+ U.S. facilities — from the Chattanooga assembly plant to distribution centers and support operations in multiple states — small compliance misses add up fast. An accumulation deadline that slips, a manifest that doesn’t reconcile, a generator status that changes without anyone catching it. This checklist breaks RCRA compliance into daily, weekly, and monthly routines so your EHS team can catch risks before they escalate, keep records audit-ready, and stay confident heading into every reporting cycle.

System of Record or System of Action? A Self-Assessment for EHS Leaders

Most compliance programs were built to store data and generate reports. That’s a system of record. But storing data isn’t the same as managing risk — and for an EHS team overseeing 60+ facilities with RCRA and Tier II obligations across multiple states, reactive compliance isn’t a strategy. This self-assessment helps EHS leaders at enterprise manufacturers honestly evaluate where their program stands today: what’s working, where the gaps are, and whether their current tools are built to drive action or just document it.

How Encamp Helps

Your Chattanooga plant generates waste at LQG scale. The obligations match.

A full automotive assembly operation — body shop, paint shop, and final assembly running in sequence — produces a wide range of regulated hazardous waste streams. Spent solvents from paint operations carry F-listed waste codes. Paint residues, characteristic wastes, used oils, and metalworking fluids add volume and complexity. As a Large Quantity Generator, the Chattanooga facility operates under the strictest RCRA tier: a 90-day accumulation limit with no exceptions, mandatory e-Manifest registration, and annual waste reporting to Tennessee’s TDEC by March 1.

Encamp tracks every waste stream, every accumulation start date, and every manifest — so your team always knows where things stand and TDEC reporting is ready when the deadline arrives.

Any VWGoA facility storing hazardous chemicals above threshold — whether that’s paint and solvents at Chattanooga, diesel and lubricants at a parts distribution center, or compressed gases at a testing facility — is a Tier II obligation. That means annual chemical inventory reports due March 1 to the SERC, the LEPC, and local fire departments in every state where a covered facility operates. Tennessee requires electronic submission through E-Plan. Other states have their own portals, contacts, and requirements.

Encamp manages chemical inventory data year-round, builds Tier II reports from that data, and handles submission to the right agencies in every state — so your team isn’t rebuilding the process from scratch each February.

The hardest part of environmental compliance at VWGoA’s scale isn’t understanding the regulations. It’s managing data, deadlines, and reporting across dozens of sites with different regulatory contacts, different state rules, and different operational profiles — often with a lean EHS team and a calendar full of competing priorities.

Spreadsheets don’t scale. Email chains don’t either. Encamp gives every facility a structured way to capture chemical and waste data throughout the year, feeds that data into a centralized compliance view, and flags issues before they become violations — across your entire U.S. footprint.

Why does it matter? Stay audit ready.

Volkswagen Group of America has made significant public commitments to environmental leadership — LEED Platinum certification, ISO 14001, renewable energy, conservation partnerships. Those commitments are visible. The regulatory record is too.

A missed Tier II deadline, a 90-day accumulation overage, or a manifest discrepancy doesn’t just create a fine. It creates a gap between the compliance story your organization tells publicly and what’s actually happening at the facility level. Encamp closes that gap — not by adding work to your team’s plate, but by taking it off.

Meet Your Team

Will Locke

Enterprise Account Manager

Dillon Virva

Chief Financial Officer

Josh Moyers

Chief Technology Officer

More Resources

Simplify Compliance With Automation and Expertise